Phase II-A has been planned with a focus on structural safety, quality construction, modern fittings, practical parking arrangements, comfortable interiors, and a clean, landscaped living environment for residents.
Sample flats are ready for each type of units for inspection and reference.
The structure of the building has been designed as per relevant IS code to make it an earthquake resistant design.
Steel from primary producers like SAIL and RINL is being used in the work for sound construction.
Quality control measures are being taken at site to maintain proper construction standards.
Main door is teakwood panelled and all other doors are flush doors.
M.S. grill windows and ventilators are provided for adequate safety.
Vitrified tile flooring is provided in rooms of all units.
Ceramic tile flooring is provided in W.C., bath, toilet, and kitchen areas of all units.
Granite stone working top with glazed tiles on walls up to 0.60 m height above counter in kitchen, along with stainless steel sink.
Dry distemper is provided on internal wall surfaces in living and dining areas of all units.
Modular types of switches and fan regulators are provided for convenient use.
3 phase electric supply is available for all types of flats.
Adequate car parking is available for Types C & D and open scooter parking for Types A & B.
Plenty of green landscaping of the whole complex is planned to provide a clean and healthy environment.
Community / Meditation Center is common with Phase II-B.